2019
DOI: 10.1016/j.scs.2019.101434
|View full text |Cite
|
Sign up to set email alerts
|

Leveraging water infrastructure asset management for energy recovery and leakage reduction

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2

Citation Types

0
31
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
7

Relationship

1
6

Authors

Journals

citations
Cited by 23 publications
(31 citation statements)
references
References 22 publications
0
31
0
Order By: Relevance
“…The Polokwane Central DMA was isolated from 7 operational clusters consisting of 14 regional water schemes that comprises of approximately 6000 km to form the CoP water asset portfolio. The Polokwane Central DMA was isolated for hydraulic modelling in prior research and does not currently reflect the operational configuration of the network [12].…”
Section: Case Studymentioning
confidence: 99%
See 3 more Smart Citations
“…The Polokwane Central DMA was isolated from 7 operational clusters consisting of 14 regional water schemes that comprises of approximately 6000 km to form the CoP water asset portfolio. The Polokwane Central DMA was isolated for hydraulic modelling in prior research and does not currently reflect the operational configuration of the network [12].…”
Section: Case Studymentioning
confidence: 99%
“…Due to a lack of historical flow data within the Polokwane Central DMA, the end user average annual daily demand (AADD) was estimated by classifying the users per land-use, size, and level of service contained in the customer profile of the Polokwane Local Municipality Water and Sanitation Asset Management Plan. The study by Bonthuys et al [12] aligned the asset management classification of the Polokwane Central DMA end users to the classification of water demand for developed areas in South Africa as defined by the Guidelines for Human Settlement Planning and Design in South African municipalities [37]. A standard demand pattern was then applied to the AADD for either residential or industrial end users ( Figure 5).…”
Section: Case Studymentioning
confidence: 99%
See 2 more Smart Citations
“…Starting from upstream area, the construction of dam involving several stakeholders such as, civil engineering, mechanical engineering, electrical engineering, biologist, social expertise, etc. In some case, the analysis to recognize the water leakage is conducting to identify the potential water losses along the river stream (Bonthuys et al, 2019).…”
Section: Introductionmentioning
confidence: 99%