2022
DOI: 10.1109/tpwrd.2022.3146154
|View full text |Cite
|
Sign up to set email alerts
|

Lifetime Estimation and Optimal Maintenance Scheduling of Urban Oil-Immersed Distribution-Transformers Considering Weather-Dependent Intelligent Load Model and Unbalanced Loading

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
2
1
1
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 18 publications
0
1
0
Order By: Relevance
“…The distribution transformer has a large quantity and a wide range, directly facing the end users of power, and its safe operation is directly related to the reliability of the power supply [1] . The devices used for online monitoring of operational status in large power transformers are unsuitable for installation in distribution transformers due to their high cost, complex structure, and large volume [2], [3] . Therefore, it is necessary to adopt a detection method suitable for detecting the operational status of distribution transformers.…”
Section: Introductionmentioning
confidence: 99%
“…The distribution transformer has a large quantity and a wide range, directly facing the end users of power, and its safe operation is directly related to the reliability of the power supply [1] . The devices used for online monitoring of operational status in large power transformers are unsuitable for installation in distribution transformers due to their high cost, complex structure, and large volume [2], [3] . Therefore, it is necessary to adopt a detection method suitable for detecting the operational status of distribution transformers.…”
Section: Introductionmentioning
confidence: 99%