2011 IEEE GCC Conference and Exhibition (GCC) 2011
DOI: 10.1109/ieeegcc.2011.5752636
|View full text |Cite
|
Sign up to set email alerts
|

Load model development based on monitoring and laboratory staged testing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…One possible practical situation that may benefit from the proposed predictor/corrector scheme is the undervoltage protection of air conditioners in Dubai (DEWA, 2011;KAROUI et al, 2011). There the Dubai Electricity and Water Authority (DEWA) requires that every chiller should be provided with an undervoltage relay with fixed voltage cut-off set at 0.75 pu and whose time delay should be less than 200 ms (DEWA, 2011).…”
Section: Chapter 5 Case Study On Dispersed Undervoltage Load Sheddingmentioning
confidence: 99%
“…One possible practical situation that may benefit from the proposed predictor/corrector scheme is the undervoltage protection of air conditioners in Dubai (DEWA, 2011;KAROUI et al, 2011). There the Dubai Electricity and Water Authority (DEWA) requires that every chiller should be provided with an undervoltage relay with fixed voltage cut-off set at 0.75 pu and whose time delay should be less than 200 ms (DEWA, 2011).…”
Section: Chapter 5 Case Study On Dispersed Undervoltage Load Sheddingmentioning
confidence: 99%