2012
DOI: 10.1109/tsg.2011.2163174
|View full text |Cite
|
Sign up to set email alerts
|

Load Scheduling and Dispatch for Aggregators of Plug-In Electric Vehicles

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
163
0
2

Year Published

2012
2012
2022
2022

Publication Types

Select...
5
5

Relationship

0
10

Authors

Journals

citations
Cited by 326 publications
(165 citation statements)
references
References 15 publications
0
163
0
2
Order By: Relevance
“…Maximum charge power (MW) 0.5 Initial capacity (MWh) 1.0 Total capacity (MWh) 5.5 We consider that load aggregators (LAs) [39][40][41] operate in our research district. LA provides a significant load reduction capacity to power network, according to dispatching commands by implementing the corresponding control measures to electricity consumers with thermostatically controllable devices.…”
Section: Parameters Valuesmentioning
confidence: 99%
“…Maximum charge power (MW) 0.5 Initial capacity (MWh) 1.0 Total capacity (MWh) 5.5 We consider that load aggregators (LAs) [39][40][41] operate in our research district. LA provides a significant load reduction capacity to power network, according to dispatching commands by implementing the corresponding control measures to electricity consumers with thermostatically controllable devices.…”
Section: Parameters Valuesmentioning
confidence: 99%
“…In [8], Xu and Wong proposed a coordinated charging control method that uses approximate dynamic programming to minimize the charging cost and reduce the power losses. Wu et al proposed algorithms that help the aggregator to determine the purchase of energy in the day-ahead market and to distribute the purchased energy to EVs [9]. Among these works, many of them have studied the use of EVs for ancillary services.…”
Section: Related Workmentioning
confidence: 99%
“…In the ABDTF, PEV load is estimated using a stochastic formulation that takes into account spatial and temporal diversity [15]. When developing the PEV power consumption, various factors are modeled, for example, PEV fleet characteristics such as charge-depleting range and fraction of tractive energy from electricity in charge-depleting mode [16], [17], charging circuits [18], travel patterns [10], [17], and PEV load control and management strategies [19]- [21]. Similar to the A/C system, the PEV aggregator entity (or entities) could be modeled as a separate agent (or agents) in the wholesale market simulation.…”
Section: B Plug-in Electric Vehiclesmentioning
confidence: 99%