2009
DOI: 10.1007/978-0-387-88617-6_11
|View full text |Cite
|
Sign up to set email alerts
|

Logic-based MultiObjective Optimization for Restoration Planning

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
8
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
7
1
1

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(8 citation statements)
references
References 13 publications
0
8
0
Order By: Relevance
“…References (Lee, Mitchell, and Wallace 2007;Gong et 2009;Cavdaroglu et al 2011) are the closest related work and a detailed review. Our approach fundamentally differs from these earlier studies: It uses the more accurate LDCM for power systems, it scales to large instances, it models cyclic interdependencies.…”
Section: Related Workmentioning
confidence: 99%
“…References (Lee, Mitchell, and Wallace 2007;Gong et 2009;Cavdaroglu et al 2011) are the closest related work and a detailed review. Our approach fundamentally differs from these earlier studies: It uses the more accurate LDCM for power systems, it scales to large instances, it models cyclic interdependencies.…”
Section: Related Workmentioning
confidence: 99%
“…different variants of the problem have been employed, which are solved using either exact methods [20,21] or heuristic and meta-heuristic approaches [22,23]. In particular, some studies [9,16,24] focus on the restoration scheduling of several networks that are interdependent physically or operationally.…”
Section: Resource Allocationmentioning
confidence: 99%
“…In the transportation logistics domain, they include food distribution [110], bicycle sharing [73,74], lock scheduling [123], and supply chain scheduling [115]. Other applications are project scheduling [70], robust call center scheduling [28], task scheduling for satellites [129], course timetabling [19], wind turbine maintenance scheduling [42], queuing design and control [113,114], service restoration planning for infrastructure networks [50], and sports scheduling [23,94,95,120,121].…”
Section: Other Scheduling and Logistics Problemsmentioning
confidence: 99%