2021
DOI: 10.1002/geot.202100006
|View full text |Cite
|
Sign up to set email alerts
|

Logistics of deep tunnel construction sites without portal access – SBT2.1 Semmering Base Tunnel

Abstract: The 27.3 km long Semmering Base Tunnel is a major component of the Baltic‐Adriatic Corridor trans‐European rail link. The SBT2.1 Fröschnitzgraben Tunnel section involves more construction work than any other contract section of the Semmering Base Tunnel project. First, two shafts over 400 m deep had to be sunk down to tunnel level in order to create the emergency station. From here, the tunnels are being driven towards Gloggnitz and Mürzzuschlag. The falling drives towards Gloggnitz, each approx. 8.5 km long, … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 3 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?