1995
DOI: 10.1080/00207549508930136
|View full text |Cite
|
Sign up to set email alerts
|

Lot size dependent lead times in a Q,R inventory system

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
2
1

Citation Types

0
26
0

Year Published

2013
2013
2021
2021

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 46 publications
(26 citation statements)
references
References 2 publications
0
26
0
Order By: Relevance
“…Thus, with a decreasing lot size, lead time is shortened, which leads to a lower demand uncertainty and a lower safety stock for a given order frequency. The interrelations described by Kim and Benton (1995) are also valid for the model developed in this paper.…”
Section: Effects Of the Decision Variables On The Safety Stock And Riskmentioning
confidence: 71%
See 2 more Smart Citations
“…Thus, with a decreasing lot size, lead time is shortened, which leads to a lower demand uncertainty and a lower safety stock for a given order frequency. The interrelations described by Kim and Benton (1995) are also valid for the model developed in this paper.…”
Section: Effects Of the Decision Variables On The Safety Stock And Riskmentioning
confidence: 71%
“…The impact of a variation of Q on the level of safety stock kept at the buyer for the case of a lot size-dependent lead time has been analysed by Kim and Benton (1995). The authors differentiated between an order frequency effect and a lead time effect: The order frequency effect refers to the fact that a reduction in Q leads to an increase in the order frequency D/Q, which in turn exposes the system to the risk of stockouts more often.…”
Section: Effects Of the Decision Variables On The Safety Stock And Riskmentioning
confidence: 99%
See 1 more Smart Citation
“…Hoque and Goyal [7] developed an optimal solution procedure for the singlevendor single-buyer production-inventory structure with uneven and equal sized shipments from the seller to the consumer and under the capacity restriction of the transport tackle. This supposition is questioned by Kim and Benton [10] and considered the effect of lot size on lead time and safety stock. Kim and Benton [10] established a linear association between lead time and lot size based on explanation of Karmarkar [9].…”
Section: Literature Reviewmentioning
confidence: 99%
“…This supposition is questioned by Kim and Benton [10] and considered the effect of lot size on lead time and safety stock. Kim and Benton [10] established a linear association between lead time and lot size based on explanation of Karmarkar [9]. They included this lead time lot size relation into the classical probabilistic continuous review (Q, r) model.…”
Section: Literature Reviewmentioning
confidence: 99%