2013
DOI: 10.1109/tsm.2012.2230032
|View full text |Cite
|
Sign up to set email alerts
|

Lot Size Management in the Semiconductor Industry: Queueing Analysis for Cycle Time Optimization

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2014
2014
2021
2021

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 6 publications
(2 citation statements)
references
References 8 publications
0
2
0
Order By: Relevance
“…Other factors that influence the cycle time have been used as a lever for cycle time reduction such as Work-In-process management [11], batch size [14], lot size [15] and [16], queue time management and priority management. Equipment management, essentially the study of preventive maintenance segregation, is proposed in [17] with the goal to determine the optimum preventive maintenance policy that results in reduced fabrication cycle times.…”
Section: Introductionmentioning
confidence: 99%
“…Other factors that influence the cycle time have been used as a lever for cycle time reduction such as Work-In-process management [11], batch size [14], lot size [15] and [16], queue time management and priority management. Equipment management, essentially the study of preventive maintenance segregation, is proposed in [17] with the goal to determine the optimum preventive maintenance policy that results in reduced fabrication cycle times.…”
Section: Introductionmentioning
confidence: 99%
“…To decrease the CT, Lin et al (2008) developed a formula for standard WIP to set the range of WIP level. Zarifoglu et al (2013) also developed a queueing model to gain an insight into the relationship among CT and lot size. Yaghoubi et al (2013) modelled multi-class multi-stage assembly systems with finite capacity as queueing networks to optimally control the service rates.…”
Section: Introductionmentioning
confidence: 99%