2005
DOI: 10.1117/12.602845
|View full text |Cite
|
Sign up to set email alerts
|

<title>Flight tests of advanced 3D-PFD with commercial flat-panel avionics displays and EGPWS system</title>

Abstract: This paper describes flight trials of Honeywell Advanced 3D Primary Flight Display System. The system employs a large-format flat-panel avionics display presently used in Honeywell PRIMUS EPIC flightdeck products and is coupled to an on-board EGPWS system. The heads-down primary flight display consists of dynamic primary-flight attitude information, flight-path and approach symbology similar to Honeywell HUD2020 heads-up displays, and a synthetic 3D perspective-view terrain environment generated with Honeywell… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2008
2008
2012
2012

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 3 publications
0
1
0
Order By: Relevance
“…There have terrain boundaries in every layer, when aircraft fly over the boundary, the terrain data in RAM will be updated from ROM, as shown in fig.4. This hierarchical data is displayed in variable accuracy, and it can reduce the amount of data processed in memory, for largescale terrain display, it can reduce processing time [10]. As mentioned above, terrain data in ROM is also constructed by this hierarchical data structure.…”
Section: B Real-time Scheduling Of Terrain Datamentioning
confidence: 99%
“…There have terrain boundaries in every layer, when aircraft fly over the boundary, the terrain data in RAM will be updated from ROM, as shown in fig.4. This hierarchical data is displayed in variable accuracy, and it can reduce the amount of data processed in memory, for largescale terrain display, it can reduce processing time [10]. As mentioned above, terrain data in ROM is also constructed by this hierarchical data structure.…”
Section: B Real-time Scheduling Of Terrain Datamentioning
confidence: 99%