2022
DOI: 10.1016/j.tust.2022.104420
|View full text |Cite
|
Sign up to set email alerts
|

Main engineering problems and countermeasures in ultra-long-distance rock pipe jacking project: Water pipeline case study in Chongqing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 30 publications
(2 citation statements)
references
References 47 publications
0
2
0
Order By: Relevance
“…The understanding of the rock parameters and geological conditions is beneficial for decreasing the potential for geo-hazards during engineering [25,28,[33][34][35][36]. The physical and mechanical parameters of the rock and soil were tested by collecting soil and rock from the slope of the open pit, making standard soil and rock specimens, using a straight shear meter, a rock shear resistance meter, and a triaxial shear tester.…”
Section: Testing Of Geotechnical and Physical Properties In The Study...mentioning
confidence: 99%
“…The understanding of the rock parameters and geological conditions is beneficial for decreasing the potential for geo-hazards during engineering [25,28,[33][34][35][36]. The physical and mechanical parameters of the rock and soil were tested by collecting soil and rock from the slope of the open pit, making standard soil and rock specimens, using a straight shear meter, a rock shear resistance meter, and a triaxial shear tester.…”
Section: Testing Of Geotechnical and Physical Properties In The Study...mentioning
confidence: 99%
“…Mud pressure: Mud pressure affects the contact between the pipe and soil, thereby affecting frictional resistance [14,17,18,28]. 6.…”
mentioning
confidence: 99%