2014
DOI: 10.1109/mias.2013.2282560
|View full text |Cite
|
Sign up to set email alerts
|

Managing Arc Flash: Collaborative Solutions in Medium-Voltage Switchgear

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2016
2016
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(1 citation statement)
references
References 3 publications
0
0
0
Order By: Relevance
“…For the case of CT7, it can even be observed that the protection level according to NFPA 70E (table 130.5 (G)) is modified exceeding 12 cal/cm 2 in case the impedance of the machine, which differs from the expected 6.78% to an improbable 8.81%. This fact would result in a very severe level of demand for personal protective equipment (PPE), requiring the inclusion of specific hoods to attend hot works at that point of the installation [24].…”
Section: Discussionmentioning
confidence: 99%
“…For the case of CT7, it can even be observed that the protection level according to NFPA 70E (table 130.5 (G)) is modified exceeding 12 cal/cm 2 in case the impedance of the machine, which differs from the expected 6.78% to an improbable 8.81%. This fact would result in a very severe level of demand for personal protective equipment (PPE), requiring the inclusion of specific hoods to attend hot works at that point of the installation [24].…”
Section: Discussionmentioning
confidence: 99%