2017
DOI: 10.15240/tul/004/2017-2-011
|View full text |Cite
|
Sign up to set email alerts
|

Master Production Scheduling and the Relevance of Included Social Criteria

Abstract: The requirements to consider worker utilizations and processing times, which depends on this worker utilization, are examined at the following paper for the Master Production Scheduling. For this reason, it is shown, that there is a gap in research regarding the social dimension in the range of Production Planning and Control. Thus, there are presented an own developed linear optimization model for the Master Production Scheduling with consideration of social criteria and an appropriate case study at this pape… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 12 publications
(20 reference statements)
0
2
0
Order By: Relevance
“…The authors have set themselves the goal of closing this gap in the long-term consideration of social aspects. In Trost et al (2017) and , for example, a corresponding approach is presented which makes it possible at the Master Production Scheduling to control the relationship between personnel capacity requirements and available capacity. This can be interpreted as a concrete handling of the work intensity and enables a longterm limitation of the workload.…”
Section: Resultsmentioning
confidence: 99%
“…The authors have set themselves the goal of closing this gap in the long-term consideration of social aspects. In Trost et al (2017) and , for example, a corresponding approach is presented which makes it possible at the Master Production Scheduling to control the relationship between personnel capacity requirements and available capacity. This can be interpreted as a concrete handling of the work intensity and enables a longterm limitation of the workload.…”
Section: Resultsmentioning
confidence: 99%
“…Work plans outline the procedures that must be taken to generate a specific product. The description includes details on the requirements for workstations, the interval between two subsequent processes, the production times, which are broken down into waiting time, setup time, processing time, and clearing time, as well as the raw materials that must be used 11 .…”
Section: Introductionmentioning
confidence: 99%