Material delivery problems in construction projects: A possible solution

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
53
0

Year Published

2013
2013
2020
2020

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 80 publications
(53 citation statements)
references
References 11 publications
0
53
0
Order By: Relevance
“…[18]; [19]). Authors in [20] state that in the process of the flow of materials from suppliers to construction sites, the focus should be on coordination and communication between project participants.…”
Section: Significance Of Materials Management In a Construction Projectmentioning
confidence: 99%
See 1 more Smart Citation
“…[18]; [19]). Authors in [20] state that in the process of the flow of materials from suppliers to construction sites, the focus should be on coordination and communication between project participants.…”
Section: Significance Of Materials Management In a Construction Projectmentioning
confidence: 99%
“…Building construction and operation are considered to be one of major consumers of material [22].Therefore, it is of particular interest to minimize handling of construction materials, which reduces costs and the chances of damage or misplacement [11], and to provide transparency of material availability and prompt responses in the supply chain [18]. A construction company must foresee usual problems in construction materials management, because poor materials management is a major source of low construction productivity, cost and time overruns [23] and it may lead to economic penalties [18].…”
Section: Significance Of Materials Management In a Construction Projectmentioning
confidence: 99%
“…The delivery of services in time or as per the agreed schedule is a problem in all spheres of our lives [11][12][13]. Travelling problems have been discussed by Rosenkrantz et al [10], while Ala-Risku and Kãrkkãinen [14] discussed the material delivery challenges for the construction industry. In their study, a possible solution for the delivery process of materials during emerging project management methods was developed [14].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Travelling problems have been discussed by Rosenkrantz et al [10], while Ala-Risku and Kãrkkãinen [14] discussed the material delivery challenges for the construction industry. In their study, a possible solution for the delivery process of materials during emerging project management methods was developed [14]. Ala-Risku and Kãrkkãinen [14] reasoned that the test of furnishing the last organiser with materials accessibility data is because of site stock control systems.…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation