2020
DOI: 10.3390/pr8101246
|View full text |Cite
|
Sign up to set email alerts
|

Material Requirements Planning Using Variable-Sized Bin-Packing Problem Formulation with Due Date and Grouping Constraints

Abstract: Correct planning is crucial for efficient production and best quality of products. The planning processes are commonly supported with computer solutions; however manual interactions are commonly needed, as sometimes the problems do not fit the general-purpose planning systems. The manual planning approach is time consuming and prone to errors. Solutions to automatize structured problems are needed. In this paper, we deal with material requirements planning for a specific problem, where a group of work orders f… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(3 citation statements)
references
References 22 publications
0
3
0
Order By: Relevance
“…In a research, a mixed model of limited chance planning has been developed to solve the MRP problem with mixed uncertainty by Zhu and his colleagues, in which there are both randomness and fuzzy discussions in the decision-making process regarding the determination of the stockpile size. In fact, the purpose of this model is to determine the accumulated size of all items despite random demand and fuzzy capacity limitation [20].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In a research, a mixed model of limited chance planning has been developed to solve the MRP problem with mixed uncertainty by Zhu and his colleagues, in which there are both randomness and fuzzy discussions in the decision-making process regarding the determination of the stockpile size. In fact, the purpose of this model is to determine the accumulated size of all items despite random demand and fuzzy capacity limitation [20].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In the following article, Dejan Gradišar and Miha Glavan [17] consider a manufacturing problem requirement plan. This plan must satisfy the capacity needs and be available by the work order's due date.…”
Section: Original Researchmentioning
confidence: 99%
“…When demand decreases, warehouse stock will increase because supplies didn't meet the demand, which is a loss for the company because of inventory cost or tied money. Lack of coordination in the planning division impacts some problems such as too much inventory, bad services, and not optimal capacity utilization [3], [4] Preventing that problem, proper planning, and material control is needed using Material Requirement Planning system [5], [6]. MRP is a manufacturing management system assisting manufacturers in dealing with production planning, scheduling, and inventory control [7], [8].…”
Section: Introductionmentioning
confidence: 99%