2001
DOI: 10.1007/978-3-642-56893-0
|View full text |Cite
|
Sign up to set email alerts
|

Mathematical Foundations of Computational Engineering

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
15
0
2

Year Published

2007
2007
2018
2018

Publication Types

Select...
4
3
2

Relationship

0
9

Authors

Journals

citations
Cited by 33 publications
(17 citation statements)
references
References 0 publications
0
15
0
2
Order By: Relevance
“…The trace of C is a constant (i=0n1λic=n). However, the determinant of C, detfalse(Cfalse)=i=0n1λic, is sensitive to the structure of the correlations and is known to satisfy 0<detfalse(Cfalse)1. This is a special case of Hadamard's inequality (see Pahl and Damrath, , p914). The upper bound is attained when C = I , i.e.…”
Section: Variational Data Assimilationmentioning
confidence: 80%
“…The trace of C is a constant (i=0n1λic=n). However, the determinant of C, detfalse(Cfalse)=i=0n1λic, is sensitive to the structure of the correlations and is known to satisfy 0<detfalse(Cfalse)1. This is a special case of Hadamard's inequality (see Pahl and Damrath, , p914). The upper bound is attained when C = I , i.e.…”
Section: Variational Data Assimilationmentioning
confidence: 80%
“…where ⇀ ∇ is vector differential operator, also called nabla operator [29], and ⃗ expresses the velocity vector including the velocities components of , V, and , responding to , , and direction, respectively, and the effective viscosity is eff = mix + , where mean viscosity was defined by…”
Section: =1mentioning
confidence: 99%
“…node 1 in Figure 8) and ANDjoins (e.g. node T4' in Figure 8), which is a well-known problem (Tauscher, 2011;Pahl and Damrath, 2001). For this class of failure, an automated conflict-solving algorithm is integrated into the software framework that, in this example, revises the XOR-split by the insertion of pseudo nodes resulting in a correct connection of variants and parallel construction processes (Figure 9).…”
Section: Mapping Phase -Stepmentioning
confidence: 99%