Determine whether to install typical ductwork, an interior ductwork system, or a BED method. If a BED method is going to be installed, proceed to step 1. Determine Construction Sequence Determine whether the ceiling will be installed prior to duct installation. Install ceiling if ductwork will be installed after ceiling installation. Install ceiling if ductwork was installed before ceiling installation. Encapsulate ductwork with at least 1.5 in. of ccSPF if BEDs are installed. Design Duct System Design a compact, low-profile duct system using industryaccepted best practices. The system should be oriented such that the greatest degree of duct burial can be achieved.