Measured Pile Setup During Load Testing and Production Piling: I-15 Corridor Reconstruction Project in Salt Lake City, Utah

Abstract: As part of the I-15 Corridor Reconstruction Project through downtown Salt Lake City, nine sets of full-scale load tests were performed at locations selected as representative of the subsurface conditions along the corridor alignment. Static compression, uplift, and lateral load tests were conducted at each test site location. The test program included dynamic monitoring of pile installation and restrike events using high-strain testing and analysis methods. Dynamic test results from restrike events on companio… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2010
2010
2023
2023

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 9 publications
references
References 2 publications
0
0
0
Order By: Relevance