Measurement Analysis of Box Girder Production Cycle Times in Indonesia Infrastructure Projects

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

2
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 8 publications
2
0
0
Order By: Relevance
“…The operational speed of RADARR is determined by the speed of execution of each activity. This is consistent with previous research, which asserts that activities form the basis for calculating execution time and the delay time between activities [25].…”
Section: Radarr Operation Execution Timesupporting
confidence: 93%
See 1 more Smart Citation
“…The operational speed of RADARR is determined by the speed of execution of each activity. This is consistent with previous research, which asserts that activities form the basis for calculating execution time and the delay time between activities [25].…”
Section: Radarr Operation Execution Timesupporting
confidence: 93%
“…The primary objective of this study is to develop a WBS as the basis for RADARR time operational planning. This research aligns with previous studies in analyzing the production time of precast box girder bridges based on activities [25]. Therefore, this study operates within a similar context but with a different research focus.…”
Section: Introductionsupporting
confidence: 79%
“…From Other studies said that, after the practice of lean construction in the project, the efficiency of work increased by about 37.95%, productivity increased by 218.03%, and the use of tools increased by 93.25% [2]. From a case study of a production box girder, the total production of one segmental box girder is 38.95 hours in total, with 32.67 hours of production time and 6.28 hours of delay time [3]. This delay time could be minimized if lean construction is applied.…”
Section: Introductionmentioning
confidence: 99%
“…Beberapa penelitian tentang faktor penyebab keterlambatan proyek telah dilakukan di Indonesia. Faktor penyebab keterlambatan proyek antara lain sumber daya manusia, material, alat, karakteristik lokasi, finansial, kondisi fisik bangunan, desain, kebijakan pemerintah, cuaca, hal yang tidak diharapkan, dan kecelakaan kerja [5,6]. Hal serupa juga dihasilkan oleh penelitian lain yaitu penyebab keterlambatan proyek di Aceh disebabkan material, alat, finansial, lingkungan, pekerja, implementasi, manajemen, politik, kriminal dan manajer proyek [7,8].…”
unclassified