1988
DOI: 10.1109/61.193882
|View full text |Cite
|
Sign up to set email alerts
|

Measurements of fast rise-time transients switching large 13.2 kV motors

Abstract: The method of fast rise-time transient voltage measurements on actual 13.8kVswitchgear installations is presented. The system configurations as well as the instrumentation and test set-up are described. Results are presented from both low voltage, 50V, and rated voltage, 13.8kV, tests.Measurements on air magnetic and vacuum circuit breakers are included.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

1995
1995
2001
2001

Publication Types

Select...
3
2

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
references
References 4 publications
0
0
0
Order By: Relevance