2021
DOI: 10.3390/en14185870
|View full text |Cite
|
Sign up to set email alerts
|

Mechanism of Splitting Failure for High Sidewall Cavern of Hydropower Station Based on Complex Function and Strain Gradient

Abstract: With the rapid development of society, the number of hydropower projects has increased. During the construction of these projects, due to excavation-induced unloading, the high sidewalls of the hydropower station are often subject to splitting failure, which produces many adverse effects on the construction of the cavern. In order to reveal the formation mechanism of splitting failure of hydropower stations, based on the strain gradient theory and elasto-plastic damage theory, we proposed an elasto-plastic dam… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
references
References 51 publications
0
0
0
Order By: Relevance