2024
DOI: 10.1021/acs.energyfuels.4c00100
|View full text |Cite
|
Sign up to set email alerts
|

Metal Hydroxide-Catalyzed Heavy Oil Upgrading in Supercritical Water: Deuterium Tracing Study

Zhong Chen,
Qiao Chen,
Dongyuan Li
et al.

Abstract: Conversion of heavy oil is urgent as most of the explored fossil oil reserves and renewable raw biodiesel can be categorized as heavy oil. Supercritical water upgrading (SCWU) is a green and promising technology for heavy oil conversion, but the hydrogen-donating capacity of pure water is inadequate. This study adopts transition-metal hydroxide (M−OH) to enhance the in situ hydrogen-donating capacity of water for the first time. Both M− OH and the corresponding metal oxide nanoparticle (MO n ) of one post-tran… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
0
0

Year Published

2024
2024
2025
2025

Publication Types

Select...
4

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(3 citation statements)
references
References 66 publications
0
0
0
Order By: Relevance
“…For the normal shutdown process, the feedstock of the system is changed from sludge to water gradually, by adding water into the sludge tank (1). The temperature of the reactor ( 7) is gradually decreased with a decreasing rate of 100 • C per hour, which is achieved by interlocking the temperature signal from the reactor (7) and the power of the electrical heater (5). According to our estimation, it takes about 6 to 8 h for the system to shut down by the normal procedure.…”
Section: Level 2 Accidentmentioning
confidence: 99%
See 2 more Smart Citations
“…For the normal shutdown process, the feedstock of the system is changed from sludge to water gradually, by adding water into the sludge tank (1). The temperature of the reactor ( 7) is gradually decreased with a decreasing rate of 100 • C per hour, which is achieved by interlocking the temperature signal from the reactor (7) and the power of the electrical heater (5). According to our estimation, it takes about 6 to 8 h for the system to shut down by the normal procedure.…”
Section: Level 2 Accidentmentioning
confidence: 99%
“…(1) Overpressure accident: if overpressure occurs in the electrical heater (5), the first step is to change the location of the heating module where salt precipitation forms, as introduced in Section 3.2. If the overpressure occurs in the heat exchanger (4) or the reactor (7), the fast shutdown procedure should be carried out directly.…”
Section: Level 2 Accidentmentioning
confidence: 99%
See 1 more Smart Citation