IADC/SPE Drilling Conference 2006
DOI: 10.2118/99138-ms
|View full text |Cite
|
Sign up to set email alerts
|

Method To Reduce Milling and Trip Times During the Recovery Operations of Permanent Production Packers

Abstract: There are many situations that require the removal of a production packer from a wellbore, whether it is a planned workover or a stuck packer during the completion process. In all cases, the packer must be washed over and recovered or milled up and pushed down to the bottom of the wellbore. Most of the methods used today are the same tools and techniques that have been in use for the last 30 or so years. These methods incorporate a shoe or milling head with a specific type retrieving tool to … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2014
2014
2014
2014

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 0 publications
0
0
0
Order By: Relevance