Methodology and apparatus for rapid power cycle accumulation and in-situ incipient failure monitoring for power electronic modules

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2020
2020

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 16 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…In [60]- [62], the PC test is performed under converter operation with real inductive loads or motors. However, the PC test with real loads is not cost-effective because real loads consume large power during a long test period.…”
Section: B Ac Power Cycling Test Circuit Close To Real Convertermentioning
confidence: 99%
“…In [60]- [62], the PC test is performed under converter operation with real inductive loads or motors. However, the PC test with real loads is not cost-effective because real loads consume large power during a long test period.…”
Section: B Ac Power Cycling Test Circuit Close To Real Convertermentioning
confidence: 99%
“…The ageing failure of IGBT modules are due to long-term work in harsh environment which leading to bear the continuous impact of thermal mechanical stress. Finally, due to the thermal fatigue cumulative damage, the working performance of the module will degrade leading the module parameters or signal shift [16]- [17]. This failure mode is slow and inevitable, if not found in time, will eventually evolve into a catastrophic failure, especially for some high reliability applications will cause incalculable significant losses.…”
Section: A General Idea Of Condition Monitoring Methodsmentioning
confidence: 99%