2016
DOI: 10.1007/978-1-4939-2981-8_68
|View full text |Cite
|
Sign up to set email alerts
|

Methods for Predicting Potential Impacts of Pile-Driving Noise on Endangered Sturgeon During Bridge Construction

Abstract: The potential impacts of pile-driving noise on Hudson River sturgeon during construction of the New NY Bridge were predicted. Abundance data for shortnose and Atlantic sturgeon derived from fisheries sampling were combined with data about the spatial extent of pile-driving noise. This approach was used to calculate the number of sturgeon that could occur within sound level isopleths exceeding peak and cumulative noise criteria used by the National Marine Fisheries Service to determine the incidental take of st… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2018
2018
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 3 publications
0
2
0
Order By: Relevance
“…Therefore, bridges must be safe and serviceable for users [8,9]. As an important part of highway transportation systems, the structural design and construction of bridges are of utmost importance to national development [10,11]; selecting appropriate construction methods is therefore crucial [6,[12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Therefore, bridges must be safe and serviceable for users [8,9]. As an important part of highway transportation systems, the structural design and construction of bridges are of utmost importance to national development [10,11]; selecting appropriate construction methods is therefore crucial [6,[12][13][14][15].…”
Section: Introductionmentioning
confidence: 99%
“…From a durability perspective, bridges are a fragile component in road construction because they are relatively more vulnerable to environmental impact than are the other parts [5]. Accordingly, many assessment criteria must be considered in the bridge design process, such as construction safety, aesthetics, integration with the surrounding environment (both landscaping and ecological maintenance), construction cost efficiency, and operational cost efficiency [9,13,16,22,24]. These conditions make bridges one of the most challenging and complex structures in construction [9].…”
Section: Introductionmentioning
confidence: 99%