2021
DOI: 10.1680/jbren.19.00013
|View full text |Cite
|
Sign up to set email alerts
|

Methods used to construct underwater pile caps on the Hong Kong–Zhuhai–Macao Bridge

Abstract: The embedded pile-cap design in the Hong Kong–Zhuhai–Macao Bridge project meant that prefabricated pier shafts and pile caps had to be installed under water. This posed a host of daunting construction-related challenges. The designer for the bridge – the Highway Planning and Design Institute, Beijing, China – proposed a method using temporary retaining structures to assist in the underwater installation. According to the local hydrogeological conditions and the capacity of the equipment available in each secti… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 1 publication
0
0
0
Order By: Relevance