2018
DOI: 10.3390/en11081978
|View full text |Cite
|
Sign up to set email alerts
|

Microgrid as a Cost-Effective Alternative to Rural Network Underground Cabling for Adequate Reliability

Abstract: Microgrids can be used for securing the supply of power during network outages. Underground cabling of distribution networks is another effective but conventional and expensive alternative to enhance the reliability of the power supply. This paper first presents an analysis method for the determination of microgrid power supply adequacy during islanded operation and, second, presents a comparison method for the overall cost calculation of microgrids versus underground cabling. The microgrid power adequacy duri… Show more

Help me understand this report
View preprint versions

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
9
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 12 publications
(9 citation statements)
references
References 20 publications
0
9
0
Order By: Relevance
“…As seen in the results presented in [11], an electric heated detached house with a battery storage and solar PV production only, would not be a reasonable solution alternative for a microgrid as a means to increase the reliability of supply. In order to enable a relatively long capability of power supply for un-reduced power demand during the network outage and microgrid islanded operation, a PV-BESS combination only, would be a very expensive option if all the equipment was paid by the prosumer.…”
Section: Assessment Methodsmentioning
confidence: 96%
See 4 more Smart Citations
“…As seen in the results presented in [11], an electric heated detached house with a battery storage and solar PV production only, would not be a reasonable solution alternative for a microgrid as a means to increase the reliability of supply. In order to enable a relatively long capability of power supply for un-reduced power demand during the network outage and microgrid islanded operation, a PV-BESS combination only, would be a very expensive option if all the equipment was paid by the prosumer.…”
Section: Assessment Methodsmentioning
confidence: 96%
“…The method used in this paper has been presented in [11]. Normal grid-connected operation of the microgrid is calculated for each hour of the year.…”
Section: Assessment Methodsmentioning
confidence: 99%
See 3 more Smart Citations