2011
DOI: 10.14429/dsj.61.61
|View full text |Cite
|
Sign up to set email alerts
|

Minimisation of Non-periodic Preventive Maintenance Cost in Series-Parallel Systems

Abstract: A new method to optimise the non-periodic preventive maintenance model of a series-parallel system is proposed. A two-stage algorithm that incorporates the failure limit policy to determine maintenance components, maintenance times, and total maintenance cost is suggested. When the reliability of the system reaches a threshold value, preventive maintenance is performed. The first stage identifies the parallel subsystem required to be maintained, while the second stage determines the component required to be ma… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Year Published

2012
2012
2012
2012

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
references
References 14 publications
0
0
0
Order By: Relevance