2020
DOI: 10.35799/jis.20.2.2020.27765
|View full text |Cite
|
Sign up to set email alerts
|

Minimize Rental Costs on Flowshop Scheduling

Abstract: This paper discusses solving the problem of rental costs in a Flowshop scheduling with n-jobs and m-Machines in small and medium-sized companies to minimize rental costs to be paid. The proposed method is the development of an existing method using several proven propositions. The method used is applied in a sandals company that rents 11 machines used to produce 6 types of products. The proposed method yields a rental fee of IDR 1,071,121.5.Keywords: Flow shop; minimize rental cost; scheduling Minimisasi Biaya… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0
2

Year Published

2021
2021
2021
2021

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(2 citation statements)
references
References 0 publications
0
0
0
2
Order By: Relevance
“…Keterangan: j i t , = total completion time job ke-i pada mesin ke-j j i a , = waktu proses dari job ke-i pada mesin ke-j 2.3.2. Proposisi 1 [3] Waktu penyelesaian pada mesin ke-m tidak akan berubah saat mesin disewa ketika:…”
Section: Minimasi Biaya Sewaunclassified
See 1 more Smart Citation
“…Keterangan: j i t , = total completion time job ke-i pada mesin ke-j j i a , = waktu proses dari job ke-i pada mesin ke-j 2.3.2. Proposisi 1 [3] Waktu penyelesaian pada mesin ke-m tidak akan berubah saat mesin disewa ketika:…”
Section: Minimasi Biaya Sewaunclassified
“…Selanjutnya, pada tahun 2019, penulis sudah melakukan generalisasi minimasi biaya sewa untuk penjadwalan flowshop dengan 𝑚 buah mesin dan 𝑛 buah pekerjaan [3]. Satu tahun selanjutnya, penulis menggabungkan teknik minimasi waktu penjadwalan optimal dan minimasi biaya sewa pada sebuah penjadwalan flowshop dengan 3 buah mesin [4].…”
unclassified