2021
DOI: 10.22630/pniks.2021.30.1.1
|View full text |Cite
|
Sign up to set email alerts
|

Minimizing of tunneling effect on existing infrastructure in Egypt

Abstract: A set of parametric studies by using the Abaqus software is conducting to investigate the effective method to seal the CWO sewer from the tunneling process. These methods include: (i) two deep grouted walls, (ii) adjacent slurry piles, (iii) bored reinforced concrete piles assisted with slurry piles, and (iv) grouted block confining the twin tunnel wall. Based on the results of parametric studies. Most of the protective studied technique was effective on reducing the tunneling effect on the ground movements.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...

Citation Types

0
0
0

Publication Types

Select...

Relationship

0
0

Authors

Journals

citations
Cited by 0 publications
references
References 5 publications
0
0
0
Order By: Relevance

No citations

Set email alert for when this publication receives citations?