Mixed‐Integer Linear Programming on Work‐Rest Schedule Design for Construction Sites in Hot Weather

Abstract: An appropriate design of work-rest schedule is recognized as an efficient way in providing better ergonomic environment, improving labor productivity as well as safety. Construction workers usually undertake physically demanding tasks in an outdoor environment, with awkward postures and repetitive motions. This study proposes a mixed-integer linear programming approach to optimize the work-rest schedule for construction workers in hot weather for the objective of maximizing the total productive time. The model… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
13
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
7
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 28 publications
(13 citation statements)
references
References 34 publications
0
13
0
Order By: Relevance
“…It was indicated that control over daily working hours ( a 2) might protect health and help workers successfully combine a full-time job with the demands of work [ 108 ]. Meanwhile, an appropriate work-rest schedule or time ( a 3) should be recognized as an efficient way of providing better ergonomic environment, improving labour health and productivity [ 35 , 109 ]. Relatively high frequency physical examination ( a 4) can provide timely health assessment for construction workers to help workers know and improve their health status [ 110 ].…”
Section: Methodsmentioning
confidence: 99%
“…It was indicated that control over daily working hours ( a 2) might protect health and help workers successfully combine a full-time job with the demands of work [ 108 ]. Meanwhile, an appropriate work-rest schedule or time ( a 3) should be recognized as an efficient way of providing better ergonomic environment, improving labour health and productivity [ 35 , 109 ]. Relatively high frequency physical examination ( a 4) can provide timely health assessment for construction workers to help workers know and improve their health status [ 110 ].…”
Section: Methodsmentioning
confidence: 99%
“…Linear programming (LP) is used to increase daily consumption from peak demand. For example, in [134]- [135], the authors deployed the LP as a consumption scheduling for shaving peak load at home. The authors also suggested a network in which the grid, home, power plants, and integrated power management system are interconnected.…”
Section: Prosumer Linear Programmingmentioning
confidence: 99%
“…Yi and Chan (2014) attempted to optimize the work pattern (heat tolerance time) during the hot weather using Monte Carlo simulation. In another study, they attempted to develop a workrest schedule and validating this schedule based on numerical experiments (Yi and Wang, 2017). Other words that appeared in this area are metabolic rate and sweat which are associated with working in hot environments.…”
Section: Work Timementioning
confidence: 99%