2016 Ieee Andescon 2016
DOI: 10.1109/andescon.2016.7836239
|View full text |Cite
|
Sign up to set email alerts
|

Model based predictive control with switcher of redundant vectors for a cascade H-bridge multilevel STATCOM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1

Citation Types

0
5
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 9 publications
(5 citation statements)
references
References 9 publications
0
5
0
Order By: Relevance
“…For the GSA, the steps of the process are i. Initialize population of "N" agents each having a random position and calculate the cost associated with the agents. The cost is calculated using the evaluation function given in Equation 29. ii.…”
Section: Figurementioning
confidence: 99%
See 2 more Smart Citations
“…For the GSA, the steps of the process are i. Initialize population of "N" agents each having a random position and calculate the cost associated with the agents. The cost is calculated using the evaluation function given in Equation 29. ii.…”
Section: Figurementioning
confidence: 99%
“…Wang et al have presented three optimum LQR to control the STATCOM. Model predictive controller (MPC) has also appeared in different studies for the control of STATCOM . In another approach, the d‐axis and q‐axis currents and voltages have been controlled separately to regulate the voltages of DC capacitor and AC system.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…However, the MPC scheme operates with variable frequency leading to a spread switching spectrum [20]. To eliminate the variable switching frequency behavior of the classical MPC, this article introduces a fixed switching frequency MPC (FSF-MPC) based on a phase shift multicarrier pulse-width modulation (PSM-PWM) approach [21,22] and the experimental assessment of the CHB-based MMC [23].…”
Section: Introductionmentioning
confidence: 99%
“…The represented dc sources could be battery cells connected to the grid through the proposed CMI. The latter of these control objectives is made possible by the proposed hierarchical approach to the control objective tracking, whereas traditional MPC requires complex logic external to the cost function [27,28]. These approaches quickly become impractical as the number of cascaded bridges increase, as the number of switching sequences increase exponentially.…”
Section: Introductionmentioning
confidence: 99%