2021
DOI: 10.20535/kpisn.2021.1.217992
|View full text |Cite
|
Sign up to set email alerts
|

Model Predictive Control Toolbox Design for Nonstationary Process

Abstract: Background. Model predictive control (MPC) approach is the basic feedback scheme, combined with high adaptive properties, which determines its successful use in the practice of design and operation of control systems. These advantages allow managing multidimensional objects with a complex structure, including nonlinearity, optimizing processes in real time within the constraints on controlled and managed variables, taking into account uncertainties in the task of objects and perturbations. Objective. The purpo… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2022
2022
2023
2023

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(2 citation statements)
references
References 16 publications
0
2
0
Order By: Relevance
“…The development of the model-predictive controller consists of the following main stages: building a predictive model, determining the performance index characterizing the regulation quality, solving the optimization problemfinding the optimal control strategy that minimizes the performance index. To construct the predictive model of the MPC, we will use the mathematical model of the oxygen converter smelting mode [5]. For the automatic control system of the oxygen converter smelting process the problem of program control and stabilization in the presence of disturbances is considered, so it is necessary to switch to the incremental form (1) of the predictive model in the state space:…”
Section: Controller Design and Implementationmentioning
confidence: 99%
“…The development of the model-predictive controller consists of the following main stages: building a predictive model, determining the performance index characterizing the regulation quality, solving the optimization problemfinding the optimal control strategy that minimizes the performance index. To construct the predictive model of the MPC, we will use the mathematical model of the oxygen converter smelting mode [5]. For the automatic control system of the oxygen converter smelting process the problem of program control and stabilization in the presence of disturbances is considered, so it is necessary to switch to the incremental form (1) of the predictive model in the state space:…”
Section: Controller Design and Implementationmentioning
confidence: 99%
“…The total installed capacity of heat pumps today is 15723 MW with an annual heat production of 86,673×10 15 J [2]. The installed capacity of geothermal heat pump systems [3] is about 6700 MW during energy production in the amount of 23,3×10 15 J/h.…”
mentioning
confidence: 99%