2016 IEEE Conference on Control Applications (CCA) 2016
DOI: 10.1109/cca.2016.7587997
|View full text |Cite
|
Sign up to set email alerts
|

Model Predictive wind turbine control for load alleviation and power leveling in Extreme Operation conditions

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
6
0

Year Published

2019
2019
2023
2023

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 8 publications
0
6
0
Order By: Relevance
“…As soon the increase of rotor speed is stopped, the individual pitch control is slowly phased in again. The example demonstrates that the proposed MPC algorithm can satisfy the rate constraints (13) while also allowing the operation on the actuators' limits, that is, _ β i = M _ β in this example.…”
Section: Resultsmentioning
confidence: 86%
See 2 more Smart Citations
“…As soon the increase of rotor speed is stopped, the individual pitch control is slowly phased in again. The example demonstrates that the proposed MPC algorithm can satisfy the rate constraints (13) while also allowing the operation on the actuators' limits, that is, _ β i = M _ β in this example.…”
Section: Resultsmentioning
confidence: 86%
“…The examples so far demonstrated that the presented control algorithm can reduce 1P load component and adequately deal with the saturation constraints (14) when transitioning between two different operating regions by phasing out the individual pitch control when the wind speed becomes too low. The purpose of the following example is to illustrate how the proposed control algorithm deals with pitch rate constraints (13). To this end, the wind turbine is excited with an extreme operating gust according to the IEC 61400-1 standard, 35 as shown in Figure 8.…”
Section: Resultsmentioning
confidence: 99%
See 1 more Smart Citation
“…The MPC system comprises an MPC algorithm and an extended Kalman filter (the state observer has already been described in detail in [13]). The MPC algorithm solves the online optimization problem Δu opt .…”
Section: Mpc For the 3 Mw Wind Turbinementioning
confidence: 99%
“…However, to date, lidar systems can still account for a significant portion of the capital and operational expenditures of wind turbines (Canet et al, 2020). In order to avoid lidar-related costs or effort, 430 some studies are directed towards predictive control without explicit preview measurement (Evans et al, 2015;Jassmann et al, 2016). In this case, the wind prediction over the MPC horizon can for instance be generated via constant extrapolation of the instantaneous wind estimate at the rotor ("persistence").…”
Section: Benefit Of "Perfect Prediction" Vs "Perfect Persistence"mentioning
confidence: 99%