2015
DOI: 10.1155/2015/493560
|View full text |Cite
|
Sign up to set email alerts
|

Modeling Analysis and Improvement of Power Loss in Microgrid

Abstract: The consumption of conventional energy sources and environmental concerns have resulted in rapid growth in the amount of renewable energy introduced to power systems. With the help of distributed generations (DG), the improvement of power loss and voltage profile can be the salient benefits. However, studies show that improper placement and size of energy storage system (ESS) lead to undesired power loss and the risk of voltage stability, especially in the case of high renewable energy penetration. To solve th… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
5
0
1

Year Published

2016
2016
2024
2024

Publication Types

Select...
7
2
1

Relationship

0
10

Authors

Journals

citations
Cited by 17 publications
(6 citation statements)
references
References 20 publications
0
5
0
1
Order By: Relevance
“…Shang Y., [8] Sufyan M., 2019 [15] Yang Y., 2013 [19] Narayan N., 2018 [20] Shin H., 2020 [21] Dulout J., [22] Lan H., 2015 [27] Carpinelli G., 2017 [25] Huo D., 2022 [26] Soltani N, 2020 [28] Yue M., 2015 [29] Bahramirad S., 2012 [30] Knap V., 2015 [31] Bhusal N., 2021 [32] Baloyi T., [33] Luo Y., 2014 [34] Astaneh M., 2018 [35] Table 1. Cont.…”
Section: Reliability Degradationmentioning
confidence: 99%
“…Shang Y., [8] Sufyan M., 2019 [15] Yang Y., 2013 [19] Narayan N., 2018 [20] Shin H., 2020 [21] Dulout J., [22] Lan H., 2015 [27] Carpinelli G., 2017 [25] Huo D., 2022 [26] Soltani N, 2020 [28] Yue M., 2015 [29] Bahramirad S., 2012 [30] Knap V., 2015 [31] Bhusal N., 2021 [32] Baloyi T., [33] Luo Y., 2014 [34] Astaneh M., 2018 [35] Table 1. Cont.…”
Section: Reliability Degradationmentioning
confidence: 99%
“…Selain itu, juga terjadi perubahan stabilitas sesaat dari jaringan utilitas, sehingga dibutuhkan sistem penyimpanan. Kehilangan daya selalu terjadi pada system micro grid, sehingga pengoptimalan semua lokasi beban menjadi sangat penting [22], [23].…”
Section: Micro Gridunclassified
“…(4) Alternate-phase penetration (APP): This selects alternate phases at different load buses of the network for PV system connection. In order to find the optimal solution, PI is analyzed using the particle swarm optimization technique in [37]. This implies that PV system should be connected in phase-A for buses R11 and R18, in phase-B for buses R16 and R17, and in phase-C for the R15 bus.…”
Section: Performance Index and Proposed Techniquesmentioning
confidence: 99%