2016
DOI: 10.1016/j.sbspro.2016.06.159
|View full text |Cite
|
Sign up to set email alerts
|

Modeling and Solving Project Portfolio and Contractor Selection Problem Based on Project Scheduling under Uncertainty

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
4
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
7
1

Relationship

1
7

Authors

Journals

citations
Cited by 11 publications
(4 citation statements)
references
References 20 publications
0
4
0
Order By: Relevance
“…However, this has been found to be highly inadequate, both in terms of incorporation and assessment of multiple-criteria like environmental and wider economic issues which are usually essentially difficult to quantify, and because traditional CBA relies heavily on estimating both demand forecasts and construction costs [1][2][3]. Over the years, various researchers dealt with such aspects of project performance, claiming that demand forecasts and construction cost estimations in particular are subject to a large degree of uncertainty-commonly referred to as optimism bias [4][5][6][7][8][9][10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…However, this has been found to be highly inadequate, both in terms of incorporation and assessment of multiple-criteria like environmental and wider economic issues which are usually essentially difficult to quantify, and because traditional CBA relies heavily on estimating both demand forecasts and construction costs [1][2][3]. Over the years, various researchers dealt with such aspects of project performance, claiming that demand forecasts and construction cost estimations in particular are subject to a large degree of uncertainty-commonly referred to as optimism bias [4][5][6][7][8][9][10][11][12].…”
Section: Introductionmentioning
confidence: 99%
“…Chakrabortty et al (2016) proposed a reactive rescheduling procedure without having any disruption information in advance. Namazian and Yakhchali (2016) investigated a project portfolio selection problem based on the schedule of the project in the uncertain nature of durations of the activities. Mehmanchi and Shadrokh (2013) with considering the effect of learning and forgetting on the human skills developed an exponential learning function by assuming the efficiency of employees performing.…”
Section: Introduction and Literature Reviewmentioning
confidence: 99%
“…Some studies have used these methods for the project selection problem. Namazian and Haji Yakhchali [4] developed a project portfolio selection problem based on the schedule of the projects so that the minimum expected pro t would be met in the shortest possible time period. In their research, because of their uncertain nature, durations of the activities were considered as semi-trapezoidal fuzzy numbers.…”
Section: Introductionmentioning
confidence: 99%