2018
DOI: 10.1051/matecconf/201821602025
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of large railway polygons

Abstract: When large junctions of railway polygons are studied, detailed modeling is subject to some limitations. Therefore, it is necessary to develop appropriate tools. This paper presents an aggregate (macromodeling) technique for necks and yards of railway stations. Results of calculations based on aggregate models are highly consistent with results of detailed modeling, which confirms the applicability of this modeling method to railway polygons. The proposed principles were implemented on the basis of the IMETRA s… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
0
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
2
2

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 2 publications
0
0
0
Order By: Relevance
“…The initial basis elements are marked with αi and the finite elements with γi. All other phases βi are intermediate [3]. The basis elements include the engagement of technological lines at the goods yard for delivery to the freight zone (receiving-and-departure yard, the breaking-up system, marshalling yard, station bottlenecks), the finite ones are the station elements to departure trains to the railway network (freight-handling equipment for loading-and-unloading zones, the make-up system, marshalling yard, receiving-and-departure yard), and intermediate ones are the elements of demurrage and waiting for operations at the basis and finite elements.…”
Section: Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…The initial basis elements are marked with αi and the finite elements with γi. All other phases βi are intermediate [3]. The basis elements include the engagement of technological lines at the goods yard for delivery to the freight zone (receiving-and-departure yard, the breaking-up system, marshalling yard, station bottlenecks), the finite ones are the station elements to departure trains to the railway network (freight-handling equipment for loading-and-unloading zones, the make-up system, marshalling yard, receiving-and-departure yard), and intermediate ones are the elements of demurrage and waiting for operations at the basis and finite elements.…”
Section: Methodsmentioning
confidence: 99%
“…The studies of Russian scientists [2] highlight the great influence of freight traffic unevenness on the transportation process. Its non-deterministic nature was identified through the application of probability theory and methods of mathematical statistics by studying the nature of train make-up and building a deterministic-stochastic series [3]. Variations can also be caused by seasonal trends in goods production and consumption and have rather stable patterns.…”
Section: Introductionmentioning
confidence: 99%