2019
DOI: 10.15407/publishing2019.52.017
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of Ukraine –European Union Energy Bridge Modes

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
3
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 0 publications
0
3
0
Order By: Relevance
“…where r r , x r are the rotor array resistance and rotor array reactance, pu; A r , B r , A x , B x are the constant coefficients of approximation table dependencies. To analyze the ASTG asynchronous mode, the transition to complex plane is done considering p=0 and taking that u fd =u fq =0 in case of short-circuited terminals for excitation winding. After the equations (1) and (2) transformations, the equations set 3…”
Section: Presentation and Discussion Of The Research Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…where r r , x r are the rotor array resistance and rotor array reactance, pu; A r , B r , A x , B x are the constant coefficients of approximation table dependencies. To analyze the ASTG asynchronous mode, the transition to complex plane is done considering p=0 and taking that u fd =u fq =0 in case of short-circuited terminals for excitation winding. After the equations (1) and (2) transformations, the equations set 3…”
Section: Presentation and Discussion Of The Research Resultsmentioning
confidence: 99%
“…The reactive power excess appearance is especially notable during load reduction hours through the visible voltage levels deviation at the energy-generating nodes in an upward direction [1]. The existing compensation means of excess reactive power like shunt reactors are not always able to perform their functions under such conditions due to their relatively low reliability [2]. An additional factor that exacerbates the problem of reactive power excess manifestations is the narrowing of the control range by automatic excitation regulators of synchronous generators.…”
Section: Definition Of the Problem To Be Solvedmentioning
confidence: 99%
See 1 more Smart Citation