2020
DOI: 10.1109/tec.2019.2938813
|View full text |Cite
|
Sign up to set email alerts
|

Modeling of Wind Speeds Inside a Wind Farm With Application to Wind Farm Aggregate Modeling Considering LVRT Characteristic

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4

Citation Types

0
13
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
8
1

Relationship

0
9

Authors

Journals

citations
Cited by 33 publications
(13 citation statements)
references
References 30 publications
0
13
0
Order By: Relevance
“…Instead, the wind farm/PV station is regarded as a single equivalent WTG/PV unit, because the algorithm complexity when forming the LIM/LAM in (2) will be greatly increased with these collector subsystems taken into account. In the early development of wind farms, the radial collector subsystem is widely adopted for multiple WTG/PV units aggregation and the LIM/LAM calculation methods tailored for the radial collector topology are developed accordingly, e.g., the impedance separation method reported in [5]. However, as the ring topology is increasingly used to raise the collector's reliability against cable faults, the existing radial topology oriented methods can not be applicable any more.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Instead, the wind farm/PV station is regarded as a single equivalent WTG/PV unit, because the algorithm complexity when forming the LIM/LAM in (2) will be greatly increased with these collector subsystems taken into account. In the early development of wind farms, the radial collector subsystem is widely adopted for multiple WTG/PV units aggregation and the LIM/LAM calculation methods tailored for the radial collector topology are developed accordingly, e.g., the impedance separation method reported in [5]. However, as the ring topology is increasingly used to raise the collector's reliability against cable faults, the existing radial topology oriented methods can not be applicable any more.…”
Section: Introductionmentioning
confidence: 99%
“…To reduce the simplification complexities, the two typical topologies of collector subsystems in Fig. 2 (a)-(b) are considered to be transformed into a pure-parallel topology which is easier for LAM derivation [5] . The layout of the pure-parallel topology and the corresponding admittance network is illustrated in Fig.…”
mentioning
confidence: 99%
“…The effectiveness of the proposed LVRT control methodologies were validated with simulation and experiments. In [18], a wind speed combination model (WSCM) was proposed using the field-measured data, which was then used as equivalent wind speeds for each WTG when modeling the entire wind farm. Results from a case study verified the correctness of WSCM and the performance of the proposed algorithm in predicting the LVRT entering status of WT generators in the wind farm.…”
Section: Introductionmentioning
confidence: 99%
“…The system operation at low wind speed is highly nonlinear, as the power generation is not significant [7]. A modeling method for wind speeds of the wind turbine generators was proposed in [8].…”
Section: Introductionmentioning
confidence: 99%