2018
DOI: 10.1088/1755-1315/194/6/062003
|View full text |Cite
|
Sign up to set email alerts
|

Modelling and assessing the effectiveness of developing the Shumovskoye field

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(6 citation statements)
references
References 4 publications
0
6
0
Order By: Relevance
“…Table 1 presents data for assessing the dependence of the oil recovery factor, estimated by the Kopytov's displacement characteristic on the well grid density (WGD, S) for the experimental areas of the Bashkir deposits in the Republic of Tatarstan [1].…”
Section: Resultsmentioning
confidence: 99%
See 2 more Smart Citations
“…Table 1 presents data for assessing the dependence of the oil recovery factor, estimated by the Kopytov's displacement characteristic on the well grid density (WGD, S) for the experimental areas of the Bashkir deposits in the Republic of Tatarstan [1].…”
Section: Resultsmentioning
confidence: 99%
“…As the fields are developed, there is a change in the structure of oil reserves; the share of hard-torecover reserves begins to grow [1].…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Concurrently, the oil reserves involved in the development of single wells differ by ten times and, respectively, amount to 1.6 and 17.4 thousand tons for the field under consideration. Therefore, when developing a deposit in a natural mode with the wells drilled to infilling, the deposits involve the reserves of fractured zones, there is an interference of wells, and the economic indicators of development worsen [1][2][3][4][5][6][7][8].…”
Section: Introductionmentioning
confidence: 99%
“…These models allow for obtaining final results of high quality and justification of their achievement through a combination of material factors. Multifactorial forecasting of labor productivity in drilling (as well as other technical and economic indicators) will make it possible to identify the reserves for growth and identify ways for using these reserves when developing a production plan [1][2][3][4].…”
Section: Introductionmentioning
confidence: 99%