2017
DOI: 10.1007/978-3-319-57861-3_15
|View full text |Cite
|
Sign up to set email alerts
|

Modelling and Evaluation of a Control Room Application

Abstract: This application paper describes the study of a control room system that has been performed inside the EU Artemis project HoliDes. The control room object of the study is for an Italian operator in gas energy distribution. Customers call the control room of the energy operator to signal malfunctioning of gas distribution and/or of gas apparatus. Upon a call the control room operators assign a technician delegated to physically reach the intervention site and make it, in first place, secure, and, in second plac… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2017
2017

Publication Types

Select...
1

Relationship

1
0

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 22 publications
0
1
0
Order By: Relevance
“…The tool has been integrated inside the DSPN solver of GreatSPN [3], which is now capable of solving MRSPN Petri net models with general transitions with the usual enabling restriction. We consider the case [5] of a multi-utility company, who works in a specified geographical area of about 2200km 2 , with 531K inhabitants. The problem the company is interested in is the optimal allocation of human resources, in order to comply with the national regulation authority rules, which require that in case of call from a client of a detected leak of gas, a technician must be on-site in less than 1 hour.…”
Section: Integration Of Alphafactory Into Greatspnmentioning
confidence: 99%
“…The tool has been integrated inside the DSPN solver of GreatSPN [3], which is now capable of solving MRSPN Petri net models with general transitions with the usual enabling restriction. We consider the case [5] of a multi-utility company, who works in a specified geographical area of about 2200km 2 , with 531K inhabitants. The problem the company is interested in is the optimal allocation of human resources, in order to comply with the national regulation authority rules, which require that in case of call from a client of a detected leak of gas, a technician must be on-site in less than 1 hour.…”
Section: Integration Of Alphafactory Into Greatspnmentioning
confidence: 99%