2009
DOI: 10.1016/j.fusengdes.2009.03.003
|View full text |Cite
|
Sign up to set email alerts
|

Modification, enhancement and operation of a water detritiation facility at the Tritium Laboratory Karlsruhe

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2009
2009
2012
2012

Publication Types

Select...
6
1

Relationship

3
4

Authors

Journals

citations
Cited by 19 publications
(4 citation statements)
references
References 8 publications
0
4
0
Order By: Relevance
“…The Combined Electrolysis Catalytic Exchange (CECE) process was chosen for ITER to process at least 20 kg h −1 of tritiated water with mean and maximal specific activity of 0.4 × 10 12 Bq kg −1 and 11.1 × 10 12 Bq kg −1 respectively [1]. This process is already developed and a decontamination factor (DF) of 2.5 × 10 5 was demonstrated at technical scale using the TRENTA facility at TLK [2].…”
Section: Hto Source and Process Requirementsmentioning
confidence: 99%
“…The Combined Electrolysis Catalytic Exchange (CECE) process was chosen for ITER to process at least 20 kg h −1 of tritiated water with mean and maximal specific activity of 0.4 × 10 12 Bq kg −1 and 11.1 × 10 12 Bq kg −1 respectively [1]. This process is already developed and a decontamination factor (DF) of 2.5 × 10 5 was demonstrated at technical scale using the TRENTA facility at TLK [2].…”
Section: Hto Source and Process Requirementsmentioning
confidence: 99%
“…No negative influence on the polymeric membrane performance was observed [8]. The necessary modifications of the commercial electrolyzers for tritium operation included for example the exchange of improper component materials, to seal the system leak-tight, 10 -7 Pam 3 s -1 for water containing parts and 10 -10 Pam 3 s -1 for gas carrying components and to remove the resin beds for water purification from the unit into the caisson for easier access [9]. The electrolyzer units are in operation for more than 4 years.…”
Section: A Electrolyser Unitsmentioning
confidence: 99%
“…Options currently under investigation such as the Combined Electrolysis Catalytic Exchange (CECE) process chosen for ITER are able to process tritiated water of a mean specific activity of 0.4·10 12 Bq kg −1 [2] with a decontamination factor (DF) of 2.5·10 5 [2,3]. The additional amount of very highly tritiated water (HTW) of up to 5.2·10 16 Bq kg −1 (expected from torus cleaning and accidental tritium release into a glove box [4]) are to be processed in a short period of time down to an activity concentration compatible with the CECE process.…”
Section: Introductionmentioning
confidence: 99%