2021
DOI: 10.3390/ma14237363
|View full text |Cite
|
Sign up to set email alerts
|

Modification Mechanism and Rheological Properties of Emulsified Asphalt Evaporative Residues Reinforced by Coupling-Modified Fiber

Abstract: In order to solve the problems of the smooth surface of basalt fiber and its weak interfacial adhesion with emulsified asphalt cold recycled mixture, a silane coupling agent (KH550) was used to treat the surface of basalt fiber and the effects of treatment concentration and soaking time on fiber modification were studied. The influence of silane coupling-modified basalt fiber (MBF) on the rheological properties of emulsified asphalt evaporation residue was studied at high and low temperatures using three routi… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(1 citation statement)
references
References 38 publications
(39 reference statements)
0
1
0
Order By: Relevance
“…Emulsified asphalt is another material used as a tack coat [17], which is a mixture of asphalt binder and water that can be used at room temperature [18]. However, emulsified asphalt requires a breaking time of at least 24 h for the binder and moisture to separate and the separated moisture to evaporate, which may not be feasible for construction projects with tight schedules [19]. In practice, the asphalt mixture is often laid soon after spraying the tack coat without sufficient curing time, which can lead to inadequate adhesion and pavement damage [20].…”
Section: Introductionmentioning
confidence: 99%
“…Emulsified asphalt is another material used as a tack coat [17], which is a mixture of asphalt binder and water that can be used at room temperature [18]. However, emulsified asphalt requires a breaking time of at least 24 h for the binder and moisture to separate and the separated moisture to evaporate, which may not be feasible for construction projects with tight schedules [19]. In practice, the asphalt mixture is often laid soon after spraying the tack coat without sufficient curing time, which can lead to inadequate adhesion and pavement damage [20].…”
Section: Introductionmentioning
confidence: 99%