1992
DOI: 10.1080/00221689209498896
|View full text |Cite
|
Sign up to set email alerts
|

Modified type III stilling basin - new method of design

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…It was also reported that the erosion and hydraulic precision of the tail waterbed should be taken into consideration during the design process. Vittal, Al-Garni [23] presented a new method of design for the type USBR III stilling basin over a major range of discharges passing the spillway structure. The modi ed new basin is arranged in double rows of the single row of friction blocks in the USBR basin, to set up the velocity distribution of the subcritical ow after the hydraulic jump in the basin.…”
Section: Introductionmentioning
confidence: 99%
“…It was also reported that the erosion and hydraulic precision of the tail waterbed should be taken into consideration during the design process. Vittal, Al-Garni [23] presented a new method of design for the type USBR III stilling basin over a major range of discharges passing the spillway structure. The modi ed new basin is arranged in double rows of the single row of friction blocks in the USBR basin, to set up the velocity distribution of the subcritical ow after the hydraulic jump in the basin.…”
Section: Introductionmentioning
confidence: 99%