2016 5th International Conference on Wireless Networks and Embedded Systems (WECON) 2016
DOI: 10.1109/wecon.2016.7993429
|View full text |Cite
|
Sign up to set email alerts
|

Monitoring and controlling of continue furnace line using PLC and SCADA

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2018
2018
2024
2024

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 11 publications
(2 citation statements)
references
References 9 publications
0
2
0
Order By: Relevance
“…They are designed to control the production process in real-time. The SCADA system is capable of controlling data from remote areas while also providing accurate monitoring results (Kaur & Bansal, 2016). SCADA can also be accessed through the internet or the cloud.…”
Section: Ict and Industry 40mentioning
confidence: 99%
“…They are designed to control the production process in real-time. The SCADA system is capable of controlling data from remote areas while also providing accurate monitoring results (Kaur & Bansal, 2016). SCADA can also be accessed through the internet or the cloud.…”
Section: Ict and Industry 40mentioning
confidence: 99%
“…In this case, the graphic objects of the operator interface must have a connection with the main basic control system and receive all necessary data from the control object. This is especially relevant for the management of equipment of increased complexity, which are CNC machines [1][2][3].…”
Section: Introductionmentioning
confidence: 99%