Many studies describe in detail that important bed changes were detectable in the river bed of the Upper Hungarian Danube in the last decades [1,2].The installation of the Gabcikovo hydropower plant in the upstream [3-5], other artificial interventions (e.g., groin fields, ripraps) and a significant volume of dredging [1,6] upset the balance in the sediment and morphodynamic system. The altered morphodynamic processes led to remarkable bed changes [1,[6][7][8]. During 2-3 decades, bed incision to a few meters of magnitude was detected and ascertained as the main