SPE Middle East Oil and Gas Show and Conference 2007
DOI: 10.2118/105141-ms
|View full text |Cite
|
Sign up to set email alerts
|

MRC Wells Performance Update: Shaybah Field, Saudi Arabia

Abstract: This paper is an update of previous SPE technical papers1,2 highlighting the results of 25 Maximum Reservoir Contact (MRC) wells drilled in the Shaybah Field either as new wells or part of a workover strategy to convert existing weak 1-km single lateral wells to MRC wells with reservoir contacts ranging from 5 to 9 km. Shaybah field, a low permeability reservoir overlain by a huge gas cap was initially developed in 1996 with 1-km single lateral horizontal wells to effectively drain the hydroc… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0

Year Published

2008
2008
2022
2022

Publication Types

Select...
5
3
1

Relationship

0
9

Authors

Journals

citations
Cited by 28 publications
(5 citation statements)
references
References 5 publications
0
5
0
Order By: Relevance
“…Horizontal well drilling through the AR-F with a slotted liner completion strategy is an effective way to ensure maximum reservoir contact (Salamy et al, 2008), as these perforated liners also provide increased accessibility for coil tubing (CT) as well as acid jobs. The studied vertical well indicates around 0.52 PSI/ft shear failure gradient (SF) against the AR-F carbonate interval (Figure 3), which is very close to the drilling mud pressure.…”
Section: Horizontal Well Placement and Borehole Stabilitymentioning
confidence: 99%
See 1 more Smart Citation
“…Horizontal well drilling through the AR-F with a slotted liner completion strategy is an effective way to ensure maximum reservoir contact (Salamy et al, 2008), as these perforated liners also provide increased accessibility for coil tubing (CT) as well as acid jobs. The studied vertical well indicates around 0.52 PSI/ft shear failure gradient (SF) against the AR-F carbonate interval (Figure 3), which is very close to the drilling mud pressure.…”
Section: Horizontal Well Placement and Borehole Stabilitymentioning
confidence: 99%
“…A similar approach can be taken up for AR-F as well. Referring to the Middle Eastern tight carbonate reservoir development strategies (Salamy et al, 2008;Chimmalgi et al, 2013;Alyan et al, 2015;Sen et al, 2021) we recommend that coil tubing (CT) carried a gun and acid stimulation will be helpful to activate this tight reservoir. Saleri et al (2004) discussed the utility of MRC (maximum reservoir contact) wells to achieve optimum reservoir performance and economic production rates from tight carbonate reservoirs in the Shaybah field of Saudi Arabia.…”
Section: Future Scope and Recommendationsmentioning
confidence: 99%
“…(29). The development of Shaybah Field in Saudi Arabia (12)(13)(14) and Saih Rawl in Oman (15) are for pressure transient analysis were published (19) , and commercial software are now available that can handle the analyses. However, the analytical solutions published so xii-Cost sensitive projects whereas reducing the well count is vital.…”
Section: Contact (Erc) and Maximummentioning
confidence: 99%
“…Solid expandable liners deployed as enablers in a workover strategy to convert single lateral wells to multi-lateral/MRC wells provided the platform for installation of downhole flow control systems. (Salamy 2007) …”
Section: Conventional Solid Expandable Applications For Production Somentioning
confidence: 99%