2014
DOI: 10.1016/j.egypro.2014.12.050
|View full text |Cite
|
Sign up to set email alerts
|

Multi-criteria Performance Analysis of BCHP System Taking Reliability and Availability into Consideration

Abstract: The failure of equipment or sub-system leads to disruption of building cooling, heating and power (BCHP) system. This paper analyzed the energetic, economic and environmental performances of BCHP system taking reliability and availability into consideration. The results indicate that the integrated performance of the optimized non-redundant BCHP system is the best while its availability of cooling and heating is lower than the separation production (SP) system. The redundant BCHP system increases 0.44% availab… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
2
1

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(1 citation statement)
references
References 9 publications
0
1
0
Order By: Relevance
“…Yang et al [33] considered the aspects of technology, economy, environment and society to evaluated the planning schemes of distributed energy supply systems. Wang et al [34] applied heating capacity and energy consumption, heating seasonal performance to conduct a systematic assessment of CO 2 heat pump system integrated with thermal energy storage (TES) systems.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Yang et al [33] considered the aspects of technology, economy, environment and society to evaluated the planning schemes of distributed energy supply systems. Wang et al [34] applied heating capacity and energy consumption, heating seasonal performance to conduct a systematic assessment of CO 2 heat pump system integrated with thermal energy storage (TES) systems.…”
Section: Literature Reviewmentioning
confidence: 99%