XLIII ACADEMIC SPACE CONFERENCE: Dedicated to the Memory of Academician S.P. Korolev and Other Outstanding Russian Scientists – 2019
DOI: 10.1063/1.5133250
|View full text |Cite
|
Sign up to set email alerts
|

Multi-objective optimization of dynamic systems and problem of the Pareto front control

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4
1

Relationship

0
5

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 13 publications
0
2
0
Order By: Relevance
“…and perform the area monitoring functions in the group management project. In this case, the optimization problem was chosen as the central task [19]. Skills acquired in the design process cover a wide range of problems, such as optimizing the flight path, choosing the optimal altitude, optimizing energy consumption, choosing the optimal number of take-off and landing seats, as well as optimizing the frequency of image capture.…”
Section: The Relationship Of the Features Of The Ongoing Project Of Gmentioning
confidence: 99%
See 1 more Smart Citation
“…and perform the area monitoring functions in the group management project. In this case, the optimization problem was chosen as the central task [19]. Skills acquired in the design process cover a wide range of problems, such as optimizing the flight path, choosing the optimal altitude, optimizing energy consumption, choosing the optimal number of take-off and landing seats, as well as optimizing the frequency of image capture.…”
Section: The Relationship Of the Features Of The Ongoing Project Of Gmentioning
confidence: 99%
“…Another urgent problem for the project under consideration is the use of man in the system control loop [19][20][21]. For example, based on data from a quadrocopter and other robots, a human operator who monitors the work of the group has the opportunity to indicate a specific research point on a map of the area.…”
Section: The Relationship Of the Features Of The Ongoing Project Of Gmentioning
confidence: 99%