2015
DOI: 10.1016/j.ifacol.2015.09.125
|View full text |Cite
|
Sign up to set email alerts
|

Multi-product Multi-stage Production Planning with Lead Time on a Rolling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
0
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
3

Relationship

0
3

Authors

Journals

citations
Cited by 3 publications
(3 citation statements)
references
References 12 publications
0
0
0
Order By: Relevance
“…Manufacturing enterprises make use of the remaining production capacity to carry out production in advance, which can make balanced use of the effective production capacity of the enterprise in each period and avoid the impact caused by the change of workers, equipment maintenance or damage, holidays, and other conditions [9]. However, production in advance will increase the inventory cost of production, which can be expressed by Equation (1).…”
Section: Analysis Of the Impact Of Production In Advance And Stockoutmentioning
confidence: 99%
See 2 more Smart Citations
“…Manufacturing enterprises make use of the remaining production capacity to carry out production in advance, which can make balanced use of the effective production capacity of the enterprise in each period and avoid the impact caused by the change of workers, equipment maintenance or damage, holidays, and other conditions [9]. However, production in advance will increase the inventory cost of production, which can be expressed by Equation (1).…”
Section: Analysis Of the Impact Of Production In Advance And Stockoutmentioning
confidence: 99%
“…Total demand of raw material j and the total raw material cost in period t can be calculated by Equations ( 8) and (9).…”
Section: Objective Functionsmentioning
confidence: 99%
See 1 more Smart Citation