Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient

Abstract: The effect of personnel qualified degree to tasks has an important role for solving multi-project human resource constrained scheduling problem. This paper conducts research on multi-mode multi-project human resource constrained scheduling problem based on dynamic programming method. First, this paper put forward the concept and estimated formula of the staff time coefficient from the perspective of how to match staff and task based on the improved cube model and establish the mixed integer programming model. … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2019
2019
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(6 citation statements)
references
References 12 publications
0
6
0
Order By: Relevance
“…An algorithm was proposed by Chen et al for Resource Constrained Multi-Project Scheduling Problem (RCMPSP) in [37]. The aim was to minimise project cost and duration by optimizing resource allocation.…”
Section: B Software Project Schedulingmentioning
confidence: 99%
“…An algorithm was proposed by Chen et al for Resource Constrained Multi-Project Scheduling Problem (RCMPSP) in [37]. The aim was to minimise project cost and duration by optimizing resource allocation.…”
Section: B Software Project Schedulingmentioning
confidence: 99%
“…Based on the proposed model, managers can select labors according to their ability and combine them to assure the highest possible overall work efficiency. Chen et al studied an integrated multiproject scheduling and multiskill human resource assignment problem based on staff time coefficient. The purpose of the proposed model is to minimize the completion time of projects and total execution cost.…”
Section: Literature Reviewmentioning
confidence: 99%
“…As shown, the activity processing time depends on the slope of processing time and maximum possible undercoverage and overcoverage. Equation (28) forces z mjt to be 1 if and only if activity j in project m is active. Equation (29) ensures that each activity must be executed completely whenever it starts.…”
Section: Mathematical Modelmentioning
confidence: 99%
“…Chen et al [15] addressed the specific process of deducing the estimation formula of the staff-time coefficient as follows: First of all, establish a coordinate system with time (t), quality (q), and cost (c). The cuboid in Figure 1 established according Table 1 is on behalf of the activity of the project .…”
Section: Staff-time Coefficientmentioning
confidence: 99%
“…However, the exact workload of each staff was not estimated in the model [14]. Chen et al studied the relationship between work efficiency and activity time, and quantified activity workload by using time rating [15]. Lv et al studied the project scheduling problem considering the difference of flexible resource capability and proposed a particle swarm optimization algorithm based on activity sequence representation [16].…”
Section: Introductionmentioning
confidence: 99%